Re: Settlement AUC to Cost Center doesn't works.

$
0
0

Hi Setiadi,

 

As I understand you are using the following process:

 

1) Expense is booked on Internal Order/ WBS.

2) This I/O or WBS is settled on AUC

3) Postings are required to be transferred from AUC back to cost center and expensed.

 

I need to explore if we can use both GL and Cost Center assignment in AIAB. Any one is possible, the second assignment being fixed.

 

However, as a work-a-round, you could explore the following options:

1) Can the expense be transferred from IO or WBS to cost center using the same GL as original expense?

 

2) If you wish to use AIAB, a longer process would be if you can use a fixed GL/ Cost Center only for this purpose and then re-transfer the expense to the required GL and Cost Center assignment.

 

Regards,
Achal