Dear Experts,
I have limited exposure to the Activity Report (M3) type of Notification.
We have 2 types M3 applications.
-One which triggeres thorugh a plan
-Other created manually.
Now, my requirement is:
-A field displaying the actual time-duration spent on a particular job (Notification), the way we have AUSZT field in M2 type of notificatiuon.
-If this is not readily available in the system, what could be the logic behind not providing such field for M3..
-If we want to calculate through development , what are the Start/End Date,Time fields for this computation. This I am asking because there are several Dates like Reqd Start/End, Reference Dt, Completion date etc (STRMN, LTRMN, NPLDA, LRMDT, BEZDT etc)
My requirment is to capture the actual time spent in carrying-out an M3 Activity.
Your help is appreciated.
Jogeswara Rao K